|
|
| Client |
EKO Getlini Ltd. |
| Project |
Construction of the gas extraction system for the disposal field “Getlini” |
| Description of the works |
Construction of waste spray system and gas extraction in biodegradation cells IB and IIIA in the disposal field |
Total cost (thous. LVL) |
30 |
| |
| Client |
Udeka Ltd. |
| Project |
Reconstruction of the water main in Ventspils |
| Description of the works |
Reconstruction of water main collector system and pump main system. Construction of the water treatment plant |
Total cost (thous. LVL) |
156 |
| |
| Client |
City Council of the Ventspils city |
| Project |
Ventspils central city library and extension |
| Description of the works |
Production, anticorrosion treatment and assembly of the frame metal structures |
Total cost (thous. LVL) |
62 |
| |
| Client |
JSC “Venceb” |
| Project |
Workshop construction in Ventspils |
| Description of the works |
Production, anticorrosion treatment and assembly of the frame metal structures |
Total cost (thous. LVL) |
70 |
| |
| Client |
LatRosTrans Ltd. |
| Project |
Custody transfer unit
of diesel fuel
|
| Description of the works |
Production and assembly of industrial pipelines and platforms, cable rack, plumbing system. Production, anticorrosion treatment and assembly of the tank V=300 m3 metal structures. |
Total cost (thous. LVL) |
197 |
| |
| Client |
JSC "Ventbunkers" |
| Project |
Reconstruction of the tower crane arm |
| Description of the works |
Production and anticorrosion treatment of tower crane arm and balance box |
Total cost (thous. LVL) |
20 |
| |
| Client |
JSC “Venceb” |
| Project |
Water treatment plant
in Ventspils
|
| Description of the works |
Connection of sewerage collector to the pumping plant of the domestic sewerage |
Total cost (thous. LVL) |
13 |
| |
| Client |
JSC “Venceb” |
| Project |
Reconstruction and extension of sewerage and water-supply systems in Ventspils |
| Description of the works |
Reconstruction of Brivibas Street between Lachplesha Street and Durbes Street. Connection of the sewerage collector to the pumping plant |
Total cost (thous. LVL) |
85 |
| |
| Client |
JSC "Venceb" |
| Project |
Metal structures for garbage disjunction lines on range "DAIBE" |
| Description of the works |
Technical project cultivation, metal structures manufacture-57 t., anticorrosion treatment of the steel structures for for walls covering and installation of a roof from sheet metal, installation of water-waste systems. |
Total cost (thous. LVL) |
78 |
| |
|
|
|