|
|
| Client |
JSC "Ventspils Nafta" |
| Project |
Oil tank V=20000m3 |
| Description of the works |
Reconstruction of the oil tank and metal structures. |
Total cost (thous. LVL) |
30 |
| |
| Client |
JSC "Ventbunkers" |
| Project |
Technological pipelines for the oil tank farm 4*20000m3 |
| Description of the works |
Production, anticorrosion treatment and assembly of metal structures, assembly of technological pipelines. |
Total cost (thous. LVL) |
138,1 |
| |
| Client |
JSC "Kalijas parks" |
| Project |
Car unloading unit |
| Description of the works |
General building works and equipment installation. |
Total cost (thous. LVL) |
69,1 |
| |
| Client |
LatRosTrans Ltd. |
| Project |
Oil tanks 2*10000m3 |
| Description of the works |
Anticorrosion treatment of the oil tanks walls and domes. |
Total cost (thous. LVL) |
78,7 |
| |
| Client |
LatRosTrans Ltd. |
| Project |
Laboratory facilities in the Ventspils city |
| Description of the works |
General building works. |
Total cost (thous. LVL) |
18,6 |
| |
| Client |
JSC "Ventbunkers" |
| Project |
Technological pipelines for oil products. |
| Description of the works |
Production, anticorrosion treatment and assembly of the metal structures. Assembly of the technological pipelines. |
Total cost (thous. LVL) |
227,7 |
| |
| Client |
JSC "VARS" |
| Project |
Oil tank farm of storehouse facility for acrylinitrile acid |
| Description of the works |
Production, anticorrosion treatment and assembly of metal structures. |
Total cost (thous. LVL) |
30,1 |
| |
| Client |
JSC "Kalijas parks" |
| Project |
Cover ramp for equipment |
| Description of the works |
Production, anticorrosion treatment and assembly of metal structures. |
Total cost (thous. LVL) |
11,4 |
| |
| Client |
JSC "Ventspils Nafta" |
| Project |
Double-service railroad rack for light oil products for 60 tank-cars L=360m |
| Description of the works |
Assembly of metal structures. Installation of technological equipment. |
Total cost (thous. LVL) |
1244,6 |
| |
| Client |
Udeka Ltd. |
| Project |
Pumping plant for drinking water |
| Description of the works |
Assembly of the technological pipelines and equipment installation. |
Total cost (thous. LVL) |
17,2 |
| |
|
|
|